Pig Manure Organic Fertilizer Fermentation Machine
Cason® Pig manure organic fertilizer fermentation machine is a professional equipment for organic waste treatment. The principle is to use aerobic bacteria to bio-decompose the organic matter in the organic waste in pig manure, and continuously ferment it in an airtight pig manure organic fertilizer fermentation machine to convert it into organic fertilizer raw materials for soil improvement and landscaping, so as to realize the reuse of organic waste resources.
Advantages of Cason® pig manure fermentation machine equipment
Cason® pig manure fermentation machine equipment treatment process has low energy consumption, low operation cost and small floor area. The treatment process is completely closed without secondary pollution.
Equipped with deodorization tower, the waste gas in the process of treatment is discharged up to the standard and passes through the 15m exhaust pipe.
The interior is made of stainless steel 304, which is corrosion resistant and has a long service life; The inner wall is equipped with thermal insulation surface, double thermal insulation.
Auxiliary air supply and heating equipment to ensure that the temperature of aerobic bacteria breeding can be rapidly reached in the fermentation machine.
The temperature can reach above 70, effectively killing pathogens, bacteria and other harmful substances in food waste, and the water generated enters the deodorization tower along with the air supply system, truly realizing harmless, reduced and resourceful.
Equipment principle of Cason® pig manure organic fertilizer fermentation machine
Cason® aerobic fermentation treatment equipment of poultry and livestock feces adopts the aerobic fermentation principle of aerobic microorganism, which enables the microorganism to use the organic matter and residual protein in poultry and livestock feces to rapidly reproduce under a certain temperature, humidity and sufficient oxygen environment.
During reproduction, they consume organic matter, protein and oxygen in feces and metabolize to produce ammonia, carbon dioxide and water vapor. At the same time, a large amount of heat is released to increase the temperature in the machine.
During the operation of the equipment, the moisture content of wet manure is controlled by mixing wet manure straw powder and fermented and decomposed dry manure, which is generally reduced from 80% to 55%.
During the processing process, biological fermentation is used to heat up and sterilize the feces, further reducing the water content of the feces, reducing the volume and volume of the feces, and producing organic fertilizer, so as to achieve the goal of harmless and resourceful feces.
At 45 ℃~70 ℃, the growth and metabolism of microorganisms can be further promoted. At the same time, the temperature above 70 ℃ can kill harmful bacteria, pathogens, insect eggs and other substances in the feces. At the same time, the temperature, humidity and PH value of beneficial bacteria can be balanced to meet the conditions for the survival of beneficial bacteria. With the continuous addition of fresh poultry and livestock feces, the microorganisms in the machine will continue to reproduce, so as to realize the harmless treatment of feces.
Equipment maintenance parameters of Cason® pig manure organic fertilizer fermentation machine
Cason® Pig manure organic fertilizer fermentation machine: it is required to check the lubrication status of the machinery room every day.
Weekly cleaning: hydraulic station maintenance, fan filter element, joint bearing, joint lubrication, etc.
Clean the filter cotton of the deodorization tower every month, communicate with the personnel of the project party about the use of the equipment every month, conduct a free primary maintenance about half a year in the first year of use of the equipment, and conduct an oil change, filter cleaning, inspection and major maintenance of the lubricating oil once a year after use of the equipment.
Fermentation machine parameters |
||||||||
|
Parameter/model |
C-40 |
C-60 |
C-90 |
C-120 |
C-140 |
C-160 |
C-220 |
Basic parameters |
Equipment weight |
≈18t |
≈22t |
≈30 t |
≈34t |
≈38t |
≈45t |
≈80t |
Effective volume of equipment |
38m³ |
56m³ |
86m³ |
119m³ |
135m³ |
151m³ |
210m³ |
|
Equipment floor area |
5*7㎡ |
5*7㎡ |
6*8㎡ |
7*9㎡ |
7*9㎡ |
7*9㎡ |
8*10㎡ |
|
Equipment diameter |
4.5m |
4.5m |
5.5m |
6m |
6m |
6m |
7.5m |
|
Equipment height |
6.7M |
8m |
8.4m |
9.3m |
10m |
10.5m |
10m |
|
Power Supply |
380v |
380v |
380v |
380v |
380v |
380v |
380v |
|
Installed power |
26kw |
26kw |
40.1kw |
41.2kw |
44.4kw |
58.4kw |
76.6kw |
|
Operating power |
14.2kw |
14.2kw |
23.4kw |
24kw |
25.8kw |
33.4kw |
46.3kw |
4.Deliver, Shipping And Serving
Time of delivery: Within 20 days after down payment received.
MOQ: 1 set
SAMPLES:For free
The shipping way: By sea
Customization is acceptable
We welcome your inquiry.